Commercial & Residential Required Inspections

 

 

REQUIRED RESIDENTIAL INSPECTIONS

780 CMR s. R110.1 General. Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of 780 CMR or of other laws or ordinances. Inspections presuming to give authority to violate or cancel the provisions of 780 CMR or of other laws or ordinances shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes and that all work shall be conducted, installed, protected and completed in a workmanlike and acceptable manner so as to secure the results intended by 780 CMR. Neither the building official nor the applicable enforcement authority shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.

 

      R110.3       REQUIRED INSPECTIONS:

      R110.3.1    EXCAVATION to ensure frost proofing

      R110.3.1    FOOTING (prior to placing of concrete)

      R110.3.1    FOUNDATION (prior to placing of concrete and after waterproofing)

      R110.3.2    M (MECHANICAL) (Rough and Final)

      R110.3.2    E (ELECTRICAL) (Rough and Final)

      R110.3.2    P (PLUMBING) (Rough and Final)

      R110.3.2    G (Gas) (Rough and Final)

      R110.3.3    FLOOD PLAIN (prior to vertical construction)

      R110.3.4    FRAME (see R110.3.5.1)

      R1103.5      ENERGY (insulation)

      R110.3.5.1 FIRE RATED ASSEMBLY (performed during rough inspection)

      R110.3.6     FINAL (scheduled after all MEPG and FD sign offs)

780 CMR s R111 CERTIFICATE OF OCCUPANCY (scheduled after HERZ reports, As-Built and or elevation certificates have been submitted and all relevant boards have signed off Assessor, Con Comm, Planning, DPW…etc.)

 

REQUIRED COMMERCIAL INSPECTIONS

780 CMR s. 110.1 General. Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of 780 CMR or of other laws or ordinances. Inspections presuming to give authority to violate or cancel the provisions of 780 CMR or of other laws or ordinances shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes and that all work shall be conducted, installed, protected and completed in a workmanlike and acceptable manner so as to secure the results intended by 780 CMR. Neither the building official nor the applicable enforcement authority shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.

 

            110.3              REQUIRED INSPECTIONS

            110.3.8            EXCAVATION (to ensure frost protection)

            110.3.1            FOOTING and FOUNDATION (Prior to Concrete Placement)

            110.3.2            CONCRETE SLAB and UNDER FLOOR (Prior to Concrete Placement)

            110.3.3            LOWEST FLOOR, FLOOD PLAIN (prior to vertical construction)

     

             110.3.8           MEP’s (rough and final)

            110.3.4            FRAME (see 110.3.6)

            110.3.5            Lath & Gypsum

            110.3.6            FIRE & SMOKE- resistant penetrations, (performed during rough)

            110.3.7            ENERGY EFFICIANCY

            110.3.8/.9        OTHER/SPECIAL

            110.3.10          FINAL

 

780 CMR s 111 CERTIFICATE OF OCCUPANCY (scheduled after HERZ reports, As-Built and or elevation certificates have been submitted and all relevant boards have signed off Assessor, Con Comm, Planning, DPW…etc.)