New Bedford/Fairhaven Bridge Replacement Public Information Meeting
Posted on: September 23, 2022 - 7:56am
The purpose of this meeting is to provide the public with the opportunity to become fully acquainted with the proposed Bridge Replacement project, US Route 6 over the Acushnet River. All views and comments submitted in response to the meeting will be reviewed and considered to the maximum extent possible.
Fairhaven / New Bedford Bridge MassDOT Public Meeting 10.3.22
Attachment | Size |
---|---|
massdot_portuguese.png | 620.74 KB |
massdot_spanish.png | 646.12 KB |
massdot_english.png | 645.76 KB |